• Type =Two pack cold cure
Application= Brush, roller, spray
Finish =Matt
Mixing Ratio =3:1 by Volume
Mixed density= Approx. 1.60 gm/cc
Pot Life : 6-8 Hrs @23ºC
2-4 Hrs @30ºC
Surface Drying time =10- 60 minutes @ 30°C
Tack free := 1-3 Hrs @ 30ºC
Hard Dry := 15-18 Hrs @ 30ºC
Scratch Hardness (IS-101)= 2 Kgs
Salt Spray:= 300 Hrs
Overcoat =16-24 hrs.
Application =rate for repair 6.5 sqm/kgs
For new surface by spray =6.5 to 12 sqm per liter
Application= Temp +10oC to +35oC.
Zinc rich system combats corrosion electrochemically
Permanent protection to the steel structure.
Excellent adhesion and flexibility to steel
Time Saving-touch dry after 35 to 40 Minutes
Exhibits excellent bond strength in cementitious repair.
• Used as a primer on reinforced bars for anticorrosive System and in concrete repairs Also, can be used on exterior surfaces as a coating of
• Machinery.
• Fertilizers tanks
• Metal Structural girders
• Metal gate and railings.